Autodesk BIM_MGT_101 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Data Management | 20% | - Execute project closeout
|
| Topic 2: Collaboration Process | 36% | - Manage Common Data Environment (CDE) workflows
|
| Topic 3: Project Needs Assessment | 28% | - Develop and implement project-specific BIM Execution Plan (BEP)
|
| Topic 4: Corporate Standards and Documentation | 16% | - Establish BIM standards aligned with organizational requirements
|
Autodesk Certified Professional in BIM Management for Building Design Sample Questions:
Question #1
A BIM manager is preparing to share a federated model package with an external cost estimator. The estimator only needs access to quantities and location-based metadata, but not design intent or proprietary elements from other teams.
What is the first step the BIM manager should take to ensure appropriate use and minimize data-related risk?
A. Convert the models into 2D views to avoid exposing embedded metadata.
B. Confirm that the model content, format, and permissions match the recipient's defined scope of use.
C. Export the models as PDFs to prevent the third party from modifying geometry.
D. Verify that the file sizes are small enough for email transmission.
Question #2
The BIM manager is working on a mixed-use project in which consultants are on different platforms and delivery timelines. The client requires COBie-compliant data handover and weekly coordination uploads.
What is the best approach to ensure project-specific BIM processes are effectively implemented from the outset?
A. Facilitate a project-specific BIM kickoff session to align all contributors on workflows, deliverables, and data-handover protocols.
B. Accept each firm's standard BIM workflows and distribute them to the team to promote consistency across consultants.
C. Establish a baseline BIM Execution Plan, then adjust it incrementally based on coordination issues as they arise.
D. Focus on setting the Common Data Environment permissions first and allow teams to organize their workflows independently.
Question #3
A project model, which includes multidisciplinary and DWG links, has been exhibiting problematic behavior. It takes a long time to save and synchronize, or crashes unexpectedly. Even though there are no imported DWGs, a scan of the model reveals a large number of IMPORT line patterns that typically come from DWG imports and links and are a possible cause of model-performance loss.
To remedy and prevent a repetition of this situation, the BIM manager is attempting to mentor the team on best practices for preparing DWGs for linking to a Revit model.
Which workflow steps will optimize the DWG files and prevent inefficiencies and loss of productive time due to repeated poor DWG-linking practices?
A. PROXYGRAPHICS=1, PURGE ALL, AUDIT, OVERKILL.
B. Delete all XREFs; change all fonts to Arial.
C. Delete all text; explode all geometry.
D. PROXYGRAPHICS=0, PURGE, AUDIT, OVERKILL.
Question #4
A regional user group raised awareness about a third-party add-on tool that enables a team to establish thresholds for model warnings. In addition, it automates suppressing warnings deemed negligible to a specific project.
Which two data points should a BIM manager gather to build a business case to have the tool approved for use across the firm? (Select two.)
A. The cost per user multiplied by the number of entire office staff, including the cost of time to implement and train on the tool.
B. The reliability of the tool creator and the time to install, test, and create training materials on the tool.
C. How many of the firm's competitors are already using the tool.
D. The language that available training materials on the tool are in.
E. The relevant user group, the projected cost to supply the group, and the anticipated time savings and/or risk mitigation that the tool would provide.
Question #5
A multidisciplinary healthcare project has multiple firms contributing to a federated model. Early coordination reviews reveal data inconsistencies, unauthorized edits, and missed communication between design teams.
What is the most appropriate first step to establish effective coordination and risk mitigation across the delivery team?
A. Develop and communicate protocols that clarify model ownership, editing rights, quality-control procedures, and expected communication channels.
B. Require each discipline to submit a detailed modelling strategy, document its assumptions, and use this information to identify and resolve potential design conflicts.
C. Assign responsibility for each firm to review and maintain its own models, document identified issues, and present findings during scheduled coordination meetings.
D. Implement tighter access controls within the Common Data Environment by defining permissions, monitoring edits, and restricting changes to authorized team members.
Solutions:
| Question #1 Correct Answer: B | Question #2 Correct Answer: A | Question #3 Correct Answer: A | Question #4 Correct Answer: B,E | Question #5 Correct Answer: A |














861 Customer Reviews
Quality and ValueITCertKing Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITCertKing testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITCertKing offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.